2013

It’s January 4th and below freezingĀ as I’m writing this, so it’s safe to say nothing has been done on the garden railroad yet this year, but here are the plans:

  • Finish the river/waterfall.
  • Finish backfilling dit into the big gaping hole in the front portion of the layout.
  • Finish installing the AirWire system in the NW-2 switcher and finally get it on the track again.
  • Convert the 0-4-0 from pure DCC to AirWire with a new G3 receiver.